
Case Study — West Hollywood, CA
The Yard WeHo.
A second flagship for The Yard — general contracted ground-up by Driftwood. Hand-troweled concrete facade, blackened steel storefront, and a training floor engineered for the brand's most demanding sessions.
— Scope
Built end to end.
Build
Full general contracting — demo, framing, MEP, concrete facade and storefront.
Finishes
Hand-troweled stucco, blackened steel, sealed concrete floor.
Fit-Out
Rig install, signage coordination, retail front and reception.



— Notes
A floor that holds heavy days.
Existing bow-truss timber ceiling preserved and blacked out. Exposed ductwork painted to recede. Rig anchored into structural steel, sealed concrete floor finished to take dropped plates without telegraphing. Every detail tuned to the way The Yard actually trains.